Application

Apply the prepared product with the appropriate trowel and level it with a level. After drying, it is necessary to roughen the plaster surface before applying the grout. The optimal working temperatures are from +5°C to 35°C. For subsequent coatings, it is important that the base has reached the drying maturity.

Technical Data Sheet
Appearance: DUST
Packaging: 25 kg paper bag on 1350 kg pallet
Color: gray
Granulation: 1.2 mm
Consumption: 1.2 m2 /bag/1.5 cm thickness
Storage: Store in dry places on wooden pallets.
Water absorption: WO
Storage time: 12 months from date of manufacture
Min application thickness for walls: Up to 10mm
Min application thickness for ceilings: Up to 7-8mm
Thermal conductivity: 0.61 W/mK
Product working time: 2 hours
Density of dry mortar: 1.6-1.75 g/cm3
Reaction to fire: Class A1
Application temperature: +5°C to +35°C
Amount of water: 5.5-6 liters of water / 25 kg of product
Material application: By hand or machine, 1-2 hands
Waiting time for the second hand: 24 hours
Compressive strength after 28 days: ≥ 8 N/mm²
Compression resistance: ≥0.5 N/mm²

Similar Products

Tile Laying
Hydrolysis System

MAXIKOLL C2T

View Product
Tile Laying
Hydrolysis System

Decoproof Advanced

View Product
Tile Laying
Hydrolysis System

ALTAKOLL C2TES1

View Product
Thermal Insulation System

BONDEX

View Product
en_USEnglish