application

Cement-based substrates must be stable, resistant and regular, free of oil and dirt and free of paint residues and must have reached the maturity period in advance. Approximately traditional cement-based floors with normal hardening time must have a curing time of at least 28 days, traditional plaster bases must dry for at least 14 days. Large unevenness or large cracks must be repaired in advance. All types of substrates must be cleaned in advance before applying the product mechanically.

Technical Data Sheet
Appearance: DUST
Packaging: 25 kg paper bag on 1350 kg pallet
Color: White, Gray
Consumption for small formats: 2-3 kg/m²
Consumption for large formats: 4-5 kg/m²
Storage: Store in dry places on wooden pallets.
Storage Time: 12 months from date of manufacture
Volumetric Measure: 1.6-1.7g/cm3
Reaction to fire: Class A1
Water for mixing: 6 liters of water for 25 kg
pH of the mixture: 13
Application temperature: +5°C to +35°C
Correction time: 35 minutes
Filling joints in walls: After 8 to 12 hours
Filling floor joints: After 24 hours
Violable: After 24 hours
Adhesive strength after 28 days: ≥1 N/mm²
FN after immersion in water: ≥ ≥1 N/mm²
FN after reaction by heating: ≥1 N/mm²
FN after freeze-thaw cycles: ≥1 N/mm²
FN after 30 min: : ≥0.5 N/mm²
Slipperiness: ≤0.5mm
Deformability: ≥S1
Caution! Keep the wall as clean as possible during application. In hot weather it is advisable to wet the bricks and blocks shortly before laying. Avoid application on windy days on frozen or thawing substrates, with a risk of freezing in the next 24 hours and at temperatures below +5-35ºC.
en_USEnglish