THERMAL INSULATION SYSTEM

Contact Us

The deKoll thermal insulation system offers comfort in your homes and energy savings. It enables a warm environment in winter and a cool environment in summer. Apply the adhesive to the entire perimeter of the polystyrene board and three dots in the center or on the entire thermal insulation board with the notched trowel. Then, the adhesive is applied to brick, concrete, filler plaster, etc. bases, by exerting a small pressure on the board. Ensure that the entire board is fully adhered. Before leveling the surface with the dekoll adhesive or leveler, place the pegs 5-6 pegs/m2.

RF6DT

Apply the product with a screed on the insulating board to a thickness of 3 mm. While still fresh, the reinforcing mesh is placed and covered with the adhesive with the metal screed. In corners or at the joints of doors or windows, it is necessary to apply the reinforcing mesh twice. The optimal working temperatures are from 5°C to 35°C. For subsequent coatings, it is important that the base has reached the drying maturity of about 5-7 days, this depends on the atmospheric conditions. After the maturation time has been reached, the liquid primer for the decorative coating (Grafiato) is applied. Initially, the primer is diluted with about 5%-10% water. Then the base is painted with a brush or roller. After 12-24 hours, the decorative coating Grafiato is applied, in the desired granulometry.

HOOD SYSTEM

1
BRICK FOUNDATION
2
BONDEX / THERMOFIX 2N1 / STIROBOND
3
EPS POLYSTYRENE / GRAPHITE
4
BONDEX / THERMOFIX 2N1 / ECOLINER
5
FIBERGLASS MESH
6
BONDEX / THERMOFIX 2N1 / ECOLINER
7
GRAFFITI PRIMER
8
GRAFFITI
Frame 427319001 1
en_USEnglish