application

Initially, it is recommended to apply the product with the straight part of the trowel to have a more uniform distribution and then with the notched part. The application is done with a suitable trowel depending on the type of tile being laid. The tiles are placed by exerting a slight pressure on the tile, ensuring that the tile is covered over the entire surface with the trowel. The opening time of the product under normal atmospheric conditions is 35 minutes for a temperature of 23°C. Atmospheric conditions can affect the drying time of the product. Care must be taken that the trowel does not form a film surface. Otherwise, it is necessary to pass the trowel over the trowel once more. It is not advisable to place the tiles with overlapping joints. The tiles are placed in such a way that they are suitable for their dimensions. A distance of 5 mm must be left on the surfaces of the joints with vertical walls.

Technical Data Sheet
Appearance: DUST
Packaging: 25 kg paper bag on 1350 kg pallet
Color: White
Consumption for small formats: 2-3 kg/m²
Consumption for large formats: 4-5 kg/m²
Storage: Store in dry places on wooden pallets.
Storage Time: 12 months from date of manufacture
Deformability: S1
Reaction to fire: Class E
Water for mixing: 7-7.5 liters of water per 25 kg
pH of the mixture: >12
Volumetric measure: 1.65 - 1.75 g/cm3
Application temperature: +5°C to +35°C
Correction time: 35-40 minutes
Filling joints in walls: After 8 to 12 hours
Filling floor joints: After 24 hours
Violable: After 24 hours
Adhesive strength after 28 days: ≥2 N/mm²
FN after immersion in water: ≥1.5 N/mm²
FN after reaction by heating: ≥2 N/mm²
FN after freeze-thaw cycles: ≥1.5 N/mm²
FN after 30 min: ≥0.5 N/mm²
Slipperiness: ≤0.5mm
Compressive strength: >10 N/mm2
Attention! For very large tile formats, apply a double layer of glue to the tile and the base. Protect the base for at least 24 hours after applying the adhesive, from driving rain as well as from frost and strong sunlight. For large tile formats, the grouting will be done 4-5 days after gluing only if waterproofing has been done.
en_USEnglish