PRODUCT PREPARATION

Mix 6–6.5 l of clean water with 20 kg of product, it is recommended to mix the resulting mass with an electric mixer until a homogeneous mass is formed. The resulting mass is left to stand for 5 minutes and it is recommended to mix again before use. Apply the product with a stainless steel trowel and level it. The product is applied in two layers where the maximum thickness per layer reaches 3-5 mm. Atmospheric conditions affect the drying time of the product.

Technical Data Sheet
Appearance: DUST
Packaging: 20 kg paper bag on 1080 kg pallet
Color:gray
Granulation:< 0.3 mm
Consumption:1.2 kg/m²/mm
Storage: Store in dry places on wooden pallets.
Storage time:12 months from date of manufacture
Dry volumetric mass:1300 kg/m3
Volumetric mass of wet mortar:1700 kg/m3
Water for mixing:6 - 6.5 liters/bag
Maximum application thickness per bag:5mm
Application layers:Two hands
Application temperature:+5°C to +35°C
Waiting time for paint application: Minimum 3 days
Compressive strength: ≥ 15 N/mm²
Adhesion to concrete (28 days):≥ 1 N/mm²
Reaction to fire:A1 Class