Application

Mix with an electric mixer 6-6.5 liters of water with a 25 kg bag of Stirobond in a clean container, until a homogeneous and lump-free mass is achieved. Apply the product with a screed on the insulating board to a thickness of 30 mm, covering about 45% of the adhesive board using the ball and strip method. Before leveling the surface with a trowel, place the fixing pins depending on the board being laid, 5-6 pins/m2. The optimal working temperatures are from 50C to 350C. For subsequent coatings it is important that the base has reached the drying maturity of about 5-7 days, this depends on the atmospheric conditions.

Technical Data Sheet
Appearance: DUST
Packaging: 25 kg paper bag on 1350kg pallet
Color:White, Gray
Granulation:0.7 mm
Consumption as adhesive:4-5 kg/m²
Storage:Store in dry places on wooden pallets.
Storage Time:12 months from date of manufacture
Volumetric Measure:1.6-1.7 g/cm³
Water for mixing:6-6.5 liters of water per 25 kg
pH of the mixture:>12
Application temperature:+5°C to +35°C
Coefficient of thermal conductivity (λ 10,dry): 0.45 W/mK
Bond strength in concrete after 28 days:1.2N/mm2
Adhesive strength on EPS:104.8 kPa
Compressive strength:11.1N/mm2
Reaction to fire: Class A1

Similar Products

Thermal Insulation System

ECOLINER

View Product
Thermal Insulation System

BONDEX

View Product
Thermal Insulation System

THERMOFIX 2N1

View Product
en_USEnglish