Application

Apply the product to the joints with a rubber spatula or with a trowel. After 20 minutes when the product has
Once it has become stable, the remaining part is cleaned with a sponge transversely to the direction of the joints.

Technical Data Sheet
Appearance: Component A (powder), Component B (liquid)
Packaging: 2kg bag and 200g can packaged in 2kg bucket
Color: Available in 26 colors
Storage: Store in dry places on wooden pallets.
Storage time: 12 months from date of manufacture
Volumetric Measure: 1.5 g/cm3
Water for mixing: 1.2-1.6 liters of water per 5 kg
pH of the mixture: 12
Application temperature: +5°C to +35°C
Working time: 1 hour
Filling floor joints: After 24 hours
Violable: After 24 hours
Compressive strength at 28 days: 15N/mm²
Flexural strength at 28 days: ≥ 2 N/mm²
Resistant to: Acids, Bases and Salts
Attention! For supports where waterproofing has been applied and large tile formats, the grouting is done 4-5 days after the application of the glue, at the end of the connection to the wall, silicone is applied in the same color as the grout.

Similar Products

Thermal Insulation System

PREMIX

View Product
Tile Laying
Hydrolysis System

ALTAKOLL C2TES1

View Product
Tile Laying
Hydrolysis System

MAXIKOLL C2T

View Product
Tile Laying
Hydrolysis System

PRO FUGA

View Product
en_USEnglish