Application

Mix the product with an electric mixer in a clean container with water until a homogeneous mass is achieved. Apply the product with a straight metal trowel. Then level with a plastic trowel in a vertical, horizontal or circular direction, always depending on the type of structure we want to create. Clean the work tools after finishing the work. The optimal working temperatures are from 5⁰C to 35⁰C.

Technical Data Sheet
Appearance: DUST
Packaging: 25 kg paper bag on 1350 kg pallet
Color: White
Storage: Store in dry places on wooden pallets.
Storage time: 12 months from date of manufacture
Application thickness: Max as big as the granule
Water for mixing: 6 liters of water for 25 kg
pH of the mixture: 13
Application temperature: +5°C to +35°C
Compressive strength after 28 days: ≥ 7.5 N/mm²
Bending resistance: ≥ 2.5 N/mm²
Thermal conductivity: 0.52 W/mK
Grafiato 1V, complete structure: 2.7 kg/m2
Grafiato 1.5R, striped structure: 3 kg/m2
Grafiato 1.5V, complete structure: 3 kg/m2
Grafiato 2R, line structure: 3.1 kg/m2
Grafiato 3R, striped structure: 3.5 kg/m2
Water absorption: W1
Reaction to fire: A1 Class

Similar Products

Thermal Insulation System

BETHESDA

View Product
Tile Laying
Hydrolysis System

Decoproof Advanced

View Product
Tile Laying
Hydrolysis System

DEKORAPID C2FT

View Product
Tile Laying
Hydrolysis System

ULTRAFUGA

View Product
en_USEnglish