Application

The product is applied with a brush or roller uniformly over the entire surface. It is necessary to wait at least 12-24 hours for BETON PRIMER to dry depending on the temperature before applying the next product on the support. Low temperatures and the presence of humidity significantly increase the drying time. It should not be applied when the support has a temperature lower than +5°C and we must ensure that it will not get wet for up to 24 hours after application.

Technical Data Sheet
Appearance: juice
Packaging: Plastic bucket 5, 10, 20 kg
Color: Reddish
Combustibility: Non-combustible
Consumption: 4-5 m²/kg
Storage: Store in dry places on wooden pallets.
Storage time: 24 months from date of manufacture

Similar Products

Tile Laying
Hydrolysis System

FLEXKOLL C2TE

View Product
Thermal Insulation System

PREMIX

View Product
Thermal Insulation System

PINTOFINISH

View Product
Tile Laying
Hydrolysis System

HYDROFIX FOUNDATION

View Product
en_USEnglish