Application

Use a stainless steel spatula. The first layer must be applied evenly to allow leveling of the support. The touch drying time is 4 - 6 hours, while the drying time for applying the other layers is 12-24 hours, depending on the ambient conditions. Apply 2 to 3 layers for a stable result and high resistance. The ambient temperature must be between 5°C and 35°C. It should not be applied in ambient conditions with high humidity.

Technical Data Sheet
Consistency:Tooth
Chemical composition: Acrylic copolymer, special additives and filler with Quartz composition.
Color: White (Pigmented in the Pintocolor system)
Usage: Ready for application.
Scratch resistance:Top with PINTO PROTECT PU 2K system.
Specific Gravity: 1.8 ± 0.05 g/cm³
Dry to touch time: 4 – 6 hours (at 23°C and 50% RH)
Reapplication Time:12-24 hours depending on weather conditions.
Viscosity:140 WHERE
Water resistance: Excellent after painting with PINTO PROTECT PU 2K (two coats).
Surface opening: 1.1 kg/m2 (Two coats application)
pH of the mixture: 9 ±0.5
Gloss:20 GU
Recommended thickness: 1.5-2 mm (two-handed application)

Similar Products

Thermal Insulation System

ULTRAFINISH

View Product
Thermal Insulation System

FINAL 07

View Product
en_USEnglish